PAGA Upgrade Services
Client PETRONAS CARIGALI
PAGA upgrade services supporting offshore operations.
Calmic · Project portfolio
From a landmark industrial salt and desalination co-development in Bintulu to PAGA, NDB, CCTV and inspection works for major oil & gas operators.
Calmic is part of a landmark co-development bringing large-scale industrial salt production and desalinated water supply to Sarawak, in partnership with MPDT Utility.
Location Samalaju Industrial Park, Bintulu, Sarawak
Large-scale industrial salt production designed for approximately 2,800,000 tonnes per year, with integrated desalinated water supply. Supported by dual-fuel reciprocating generator sets with combined capacity of approximately 46–48 MW.
PAGA, NDB, CCTV, server maintenance, inspection and manpower support for PETRONAS Carigali, PTTEP, CPOC, KPOC, UZMA, MLNG and others.
Client PETRONAS CARIGALI
PAGA upgrade services supporting offshore operations.
Client PTTEP
Server maintenance support for operator systems.
Client SIP / CPOC / Optreum Sdn Bhd
Non-Directional Beacon installation and commissioning on RS Songkla.
Client SIP / CPOC / Optreum Sdn Bhd
Preventive maintenance on the Public Address and General Alarm system aboard RS Songkla.
Client Menang Alam Sentosa Sdn Bhd
CCTV preventive maintenance at KPOC KLCC, Labuan and Kota Kinabalu offices.
Client CPOC
Server maintenance support for CPOC systems.
Client SIP / CPOC / Optreum Sdn Bhd
Ongoing NDB maintenance on the offshore vessel RS Songkla.
Client KBCS / MLNG
CSR outreach programme under MLNG at SK Sungai Nylar.
Client UZMA
Supply of certified riggers and abseilers for MARSYA stability testing.
Client UZMA
Third-party inspection on UZMA-appointed inspector for visual external inspection and UT thickness surveys.
Client KPOC
CCTV server replacement works for KPOC (multiple work packages in 2022).
Work across PAGA, NDB, CCTV, server maintenance, inspection, rigger/abseiler supply and industrial co-development.
PAGA upgrade services.
Server maintenance.
NDB installation, commissioning and maintenance; PAGA PPM on RS Songkla.
CCTV PPM and server replacement.
Rigger/abseiler supply and third-party inspection support.
CSR outreach programme.
Next project
From engineering and inspection to decommissioning and certified manpower, Calmic can support your next assignment. Contact the team to start a conversation.
Contact Calmic